Friday, 2 December 2011

looking pretty good

flooring is in, painting done, though i have to find the missing drawer handle. windows still have to be done. now thats it has stopped raining, i supose i now have no excuse.



frig and what will be the kitchen bench are in. they fit with room to spare - 280mm, in the area that used to be the single bunks. our bed just needs a base and matress and that is all ready to go,  gonna do some more street shopping to find a double bed base. got power from the kitchen via an extension cord, through the cupboard, under the bed and up around the back. bed size will allow a cabnet/shelf or what ever at the foot of the bed.

No comments:

Post a Comment